Showing posts with label floor. Show all posts
Showing posts with label floor. Show all posts
Sunday, August 24, 2008
Chapel Floor
On our August 9th B&G workday, Marcie led a crew in installing a new floor in the chapel. The surface is glued down solid bamboo . This surface was chosen because it is a renewable, green material that has proven itself capable of surviving floodwaters.
Current plans are to use the same material in the sanctuary, so this gave us very good experience before we undertake that much larger project. In the sanctuary, we will lay a labyrinth pattern into the bamboo.
Subscribe to:
Posts (Atom)